Six disciplines, one workshop.

From the first survey to the last bolt, every piece is drawn, cut, welded, finished and installed by our own people. Choose a discipline to see how we work and what it costs in time.

Disciplines

6

Typical lead time

4–18 weeks

Install radius

Up to 250 km

Certified

EN 1090-2 EXC3

Folded blackened steel stair tread against a concrete wall

Staircases

A stair is the one piece of steel people touch every day. We design it with the architect, calculate it with our engineer and fit it in one controlled lift.

Cantilevered stairs

Spiral stairs

Folded plate stairs

External escape stairs

Typical lead time

9–14 weeks

Stainless and glass balustrades on a harbour apartment facade

Railings and balustrades

Railings have to meet building regulations and still look like they belong to the architecture. We handle both, from the calculation to the last glass clamp.

Balcony balustrades

Glass balustrades

Stair handrails

Juliet balconies

Typical lead time

6–16 weeks

Anthracite slatted steel sliding gate in front of a white house

Gates and fences

A gate is used thousands of times a year. We build it with sealed bearings, adjustable guides and a finish that survives decades of weather.

Sliding gates

Swing gates

Slatted fences

Bin and bike stores

Typical lead time

5–8 weeks

Perforated weathering steel screen on an arts centre at sunset

Facades and screens

Facade metalwork is where the drawing has to be perfect. We turn the architect's pattern into cutting files, panel by panel, and install with a tolerance of two millimetres.

Perforated screens

Rainscreen cladding

Sun shading fins

Feature walls

Typical lead time

10–18 weeks

Slim steel and glass entrance canopy on a brick office building at dusk

Canopies and structures

Small structures carry big expectations. We design canopies and frames that look slender, drain properly and are calculated by a structural engineer.

Entrance canopies

Pergolas

Mezzanine floors

Glazing frames

Typical lead time

8–12 weeks

Blackened steel fireplace surround and shelving in a calm living room

Bespoke pieces

Some pieces only exist once. We build them with the same drawings, tolerances and care as a stair, just closer to the people who live with them.

Fireplace surrounds

Shelving and joinery

Tables and benches

Art installations

Typical lead time

4–10 weeks

Send us a sketch.

A photo, a napkin drawing or the architect’s detail is enough. We reply with a measured drawing and a fixed price.

What happens after you write to us

Within 2 days

A call back from the person who will run your project

Within 10 days

Measured drawing and a fixed quote, itemised

After sign-off

Fabrication and installation dates in writing

Send us a sketch.

A photo, a napkin drawing or the architect’s detail is enough. We reply with a measured drawing and a fixed price.

What happens after you write to us

Within 2 days

A call back from the person who will run your project

Within 10 days

Measured drawing and a fixed quote, itemised

After sign-off

Fabrication and installation dates in writing

Send us a sketch.

A photo, a napkin drawing or the architect’s detail is enough. We reply with a measured drawing and a fixed price.

What happens after you write to us

Within 2 days

A call back from the person who will run your project

Within 10 days

Measured drawing and a fixed quote, itemised

After sign-off

Fabrication and installation dates in writing

Create a free website with Framer, the website builder loved by startups, designers and agencies.