Six disciplines, one workshop.
From the first survey to the last bolt, every piece is drawn, cut, welded, finished and installed by our own people. Choose a discipline to see how we work and what it costs in time.
Disciplines
6
Typical lead time
4–18 weeks
Install radius
Up to 250 km
Certified
EN 1090-2 EXC3

Staircases
A stair is the one piece of steel people touch every day. We design it with the architect, calculate it with our engineer and fit it in one controlled lift.
Cantilevered stairs
Spiral stairs
Folded plate stairs
External escape stairs
Typical lead time
9–14 weeks

Railings and balustrades
Railings have to meet building regulations and still look like they belong to the architecture. We handle both, from the calculation to the last glass clamp.
Balcony balustrades
Glass balustrades
Stair handrails
Juliet balconies
Typical lead time
6–16 weeks

Gates and fences
A gate is used thousands of times a year. We build it with sealed bearings, adjustable guides and a finish that survives decades of weather.
Sliding gates
Swing gates
Slatted fences
Bin and bike stores
Typical lead time
5–8 weeks

Facades and screens
Facade metalwork is where the drawing has to be perfect. We turn the architect's pattern into cutting files, panel by panel, and install with a tolerance of two millimetres.
Perforated screens
Rainscreen cladding
Sun shading fins
Feature walls
Typical lead time
10–18 weeks

Canopies and structures
Small structures carry big expectations. We design canopies and frames that look slender, drain properly and are calculated by a structural engineer.
Entrance canopies
Pergolas
Mezzanine floors
Glazing frames
Typical lead time
8–12 weeks
