Cantilevered blackened steel staircase with a slim flat-bar balustrade in a concrete interior

Architectural steel, made to measure.

Staircases, railings, gates and facade elements. Drawn, fabricated and installed by one workshop since 1994.

BV-2614 · Cantilevered stair

BV-2614 · Cantilevered stair

S355 plate, 10 mm · blackened, waxed

S355 plate, 10 mm · blackened, waxed

EN 1090-2

Execution class EXC3

ISO 3834-2

Certified welding

Since 1994

One workshop, 35 people

250 km

Own installation teams

Every piece is drawn before it is cut.

That is why it fits on the day we install it. Architects come to us with details that have to work in steel. Homeowners come with a space that needs one exceptional piece. Both get the same thing, a measured drawing to sign off, a fabrication date in writing and one person who answers the phone from first sketch to final bolt.

Perforated weathering steel screen at the entrance of an arts centre

BV-2541

Perforated screen, Northbank Arts Centre

148 laser-cut panels whose perforation follows the architects’ daylight study.

Material

Weathering steel S355J2W, 3 mm

Finish

Pre-weathered, clear sealed

Dimensions

148 panels, 9.6 m high

Location

Northbank Arts Centre

Build time

14 weeks

Year

2025

Eleven weeks from survey to the last bolt.

A typical stair or balustrade. You know every date before we cut the first plate.

Week 0

Survey

We measure the opening with a laser scanner and talk through use, loads and finish on site.

Week 0

Survey

We measure the opening with a laser scanner and talk through use, loads and finish on site.

Week 1–2

Drawing

Shop drawings and a fixed, itemised quote. Nothing is cut before you sign.

Week 1–2

Drawing

Shop drawings and a fixed, itemised quote. Nothing is cut before you sign.

Week 3–8

Fabrication

Cut, bent, welded and trial assembled in our workshop. You are welcome to visit.

Week 3–8

Fabrication

Cut, bent, welded and trial assembled in our workshop. You are welcome to visit.

Week 9–10

Finish

Galvanizing, powder coating or hand finishing, checked against your approved sample.

Week 9–10

Finish

Galvanizing, powder coating or hand finishing, checked against your approved sample.

Week 11

Installation

Our own team installs, cleans up and hands over with care instructions.

Week 11

Installation

Our own team installs, cleans up and hands over with care instructions.

“We send them the drawings we are least sure about. They come back with a better detail and a date that holds.”

Clara Holm

Architect, Holm Studio

Questions we hear every week.

Something else on your mind? Call or write, the person who answers knows the workshop.

What does a steel staircase cost?

Most stairs we build cost between 18 000 and 45 000 EUR including drawings, finish and installation. After a short call we give you a realistic range, the fixed price follows with the drawings.

Do you work for architects or private clients?

Both. About half of our work comes through architects and contractors, the other half from homeowners who want one exceptional piece.

How far do you travel?

Our own teams install up to 250 km from the workshop. Further away on request, with the same team that built your piece.

Who does the structural calculations?

Our structural engineer, included in the quote for every load-bearing piece and ready for your building control file.

Can I see finish samples?

Yes. We send up to two samples free with every quote, so you can judge colour and texture in your own light.

What guarantee do you give?

Five years on workmanship and ten years on corrosion protection for galvanized and duplex coated parts.

Send us a sketch.

A photo, a napkin drawing or the architect’s detail is enough. We reply with a measured drawing and a fixed price.

What happens after you write to us

Within 2 days

A call back from the person who will run your project

Within 10 days

Measured drawing and a fixed quote, itemised

After sign-off

Fabrication and installation dates in writing

Send us a sketch.

A photo, a napkin drawing or the architect’s detail is enough. We reply with a measured drawing and a fixed price.

What happens after you write to us

Within 2 days

A call back from the person who will run your project

Within 10 days

Measured drawing and a fixed quote, itemised

After sign-off

Fabrication and installation dates in writing

Send us a sketch.

A photo, a napkin drawing or the architect’s detail is enough. We reply with a measured drawing and a fixed price.

What happens after you write to us

Within 2 days

A call back from the person who will run your project

Within 10 days

Measured drawing and a fixed quote, itemised

After sign-off

Fabrication and installation dates in writing

Create a free website with Framer, the website builder loved by startups, designers and agencies.