Stainless and glass balustrades on a harbour apartment building

BV-2588

Multi-residential

2025

Harbour balustrades, Quay Seven

412 metres of stainless and glass balustrades for an eight-storey building on the waterfront.

The brief

Salt spray, wind loads at height and a tight construction programme that released one floor every two weeks.

Our solution

Marine grade stainless with clamped glass, prefabricated in floor batches and delivered in the order of installation. Each floor was handed over within three days of release.

Specification

Discipline

Railings and balustrades

Material

Stainless 1.4404, laminated glass 2 × 10 mm

Finish

Brushed K320

Dimensions

412 m over 8 floors

Location

Quay Seven, harbour front

Year

2025

Build time

16 weeks

Stainless handrail post with a glass balustrade clamp above a harbour at sunset
Brushed stainless steel surface with a folded edge

“Floor by floor, exactly when the site needed them. No snagging list for the balustrades.”

Send us a sketch.

A photo, a napkin drawing or the architect’s detail is enough. We reply with a measured drawing and a fixed price.

What happens after you write to us

Within 2 days

A call back from the person who will run your project

Within 10 days

Measured drawing and a fixed quote, itemised

After sign-off

Fabrication and installation dates in writing

Send us a sketch.

A photo, a napkin drawing or the architect’s detail is enough. We reply with a measured drawing and a fixed price.

What happens after you write to us

Within 2 days

A call back from the person who will run your project

Within 10 days

Measured drawing and a fixed quote, itemised

After sign-off

Fabrication and installation dates in writing

Send us a sketch.

A photo, a napkin drawing or the architect’s detail is enough. We reply with a measured drawing and a fixed price.

What happens after you write to us

Within 2 days

A call back from the person who will run your project

Within 10 days

Measured drawing and a fixed quote, itemised

After sign-off

Fabrication and installation dates in writing

Create a free website with Framer, the website builder loved by startups, designers and agencies.